BIM CASE STUDIES

8-min.PNG

We were required to do the Mechanical, electrical, plumbing, HVAC and electrical coordination internally and with the structure model for the school project

School Building

MEP COORDINATION

MU2.PNG

The client was looking for MEP BIM modeling and coordination. We have deployed a team of 4 mechanical engineers and 1 quality checker to ensure quality and on-time delivery. 

Mixed-use Building

MEP MODELING & COORDINATION

S14-min.PNG

The requirement of the client was to convert the point cloud to a highly detailed MEP model. The project was charged on the lump sum basis.

Airport Terminal Building

MEP SCAN TO BIM

Get Free Quote | Start Pilot Project